In 2006, commercial quantities of oil were confirmed to exist in the Lake Albert basin in Uganda. The Oil companies in Uganda; CNOOC LTD, TOTAL and TULLOW PLC completed the exploration phase and are now headed into development, which will consequently lead to the production of Uganda’s oil resources.
Once produced, the crude oil will be partly refined in Uganda to supply the local market and partly exported to the international market. The export to the international market will be through an export crude oil pipeline; The East Africa Crude Oil Export Pipeline (EACOP). This pipeline will be constructed and operated through a Pipeline Company with shareholding from the Uganda National Oil Company, the Tanzania Petroleum Development Corporation and the three oil companies; CNOOC, TOTAL and TULLOW.

THE EACOP PROJECT

The EACOP is a 1,443km crude oil export pipeline that will transport Uganda’s crude oil from Kabaale – Hoima in Uganda to the Chongoleani peninsula near Tanga port in Tanzania.

  • The pipeline route was selected by the Government of Uganda as the least cost and most robust.
  • Due to the viscous and waxy nature of Uganda’s crude oil, the pipeline will need to be heated along the entire route, making the EACOP the longest electrically heated pipeline in the world.
  • The pipeline will be buried to minimize impact on the environment, with some facilities above the ground, designed to ensure minimal environmental and social impact.
  • The project will be compliant with the Ugandan and Tanzanian national legislations and international requirements.
  • The Marine Export Storage Terminal and the Load-Out Facility will be located north of Tanga port over the Chongoleani peninsula.

Key Figures

null

1,443km

crude oil export pipeline

null

216Kbd

export flow rate barrels per day at plateau production

null

Over 60%

increase in FDI of Uganda & Tanzania during the construction phase

null

3.5 Billion

USD investment

null

Over 500,000

tonnes of imported equipment