Surveys & Studies

Different studies are on-going in order to define the final design of the pipeline;

  • The Geophysical and Geotechnical Surveys – Thorough and comprehensive site investigation for design and construction
  • The Front End Engineering Design (FEED) – To determine the details on how the pipeline will be designed constructed and operated
  • Environmental and Social Impact Assessment (ESIA)

-To establish the potential impacts on the natural environment and the human environment including the respect of human rights,
-Evaluate the potential environment and social (including human rights) risks and opportunities
-Design measures to avoid, mitigate and manage negative impacts
-Identify and enhance the positive impacts

(October 11, 2017)
Geotechnical-and-Geophysical-Surveys-Leaflet.pdf download View | Download
Categories: Surveys

Key Figures

null

1,443km

crude oil export pipeline

null

216Kbd

export flow rate barrels per day at plateau production

null

Over 60%

increase in FDI of Uganda & Tanzania during the construction phase

null

3.5 Billion

USD investment

null

Over 500,000

tonnes of imported equipment